Teaser
 
Manufacture of steel

Manufacture of steel


The new ‘gold’


Electric steel plants with electric arc furnaces are also very widespread. An arc extending from three graphite electrodes to the cast produces temperatures of up to 3500 °C and causes the material to melt. The melting process takes around 30-45 minutes.

Typical batch sizes for both procedures are 100-150t. There are also still steel moulds which can hold up to 350t.

Further processing: The crude steel is poured into a steel casting ladle underneath the converter / electric furnace. This ladle is sited on the ladle ferry. After casting, the ferry moves out from underneath the converter and passes the material on to the crane scales for transportation.
Etc Products
Close

Recommend Site:

Please enter your name and the email adress of the receiver.